HV Switchgear

11kV Panel Installation — Lekki Free Trade Zone

👤 Client
Free Trade Zone Authority
📍 Location
Lekki, Lagos
📅 Year
2024
⏱ Duration
4 months
💰 Value
₦62,000,000
🔄 Status
Completed

Scope of Work

Switchgear supply, protection relay configuration, and commissioning.

Supply and installation of 11kV switchgear panels with numerical protection relays for a free trade zone facility expansion.

Similar Projects

🏗
Power Quality Survey — Lagos State Ministries
🏗
16kV Solar Substation Upgrade — ONDO
🏗
200kW Rooftop Solar Installation — Ikeja GRA
🏗
Industrial Power Distribution Network — Port Harcourt
All Projects →

Ready to Start a Similar Project?

Our team is ready to assess your site, design a solution, and deliver on time.

Get in Touch
High Voltage Systems☀️Solar Energy🏗️EPC Contracting🔍Energy Audit🔧Infrastructure MaintenanceHV Switchgear☀️Solar Air Conditioning🏭Industrial Automation🔌ATS Panels🌍Nationwide Coverage📐Design & Engineering🔬Feasibility StudiesHigh Voltage Systems☀️Solar Energy🏗️EPC Contracting🔍Energy Audit🔧Infrastructure MaintenanceHV Switchgear☀️Solar Air Conditioning🏭Industrial Automation🔌ATS Panels🌍Nationwide Coverage📐Design & Engineering🔬Feasibility Studies