EPC Contracting

Industrial Power Distribution Network — Port Harcourt

👤 Client
Industrial Park Developer
📍 Location
Port Harcourt, Rivers State
📅 Year
2024
⏱ Duration
8 months
💰 Value
₦210,000,000
🔄 Status
Completed

Scope of Work

Feasibility study, design, procurement, construction, and commissioning of full power distribution network.

Full EPC delivery of a power distribution network for an industrial park, including transformers, LV distribution panels, and cable networks across multiple buildings.

Similar Projects

🏗
200kW Rooftop Solar Installation — Ikeja GRA
🏗
16kV Solar Substation Upgrade — ONDO
🏗
Power Quality Survey — Lagos State Ministries
🏗
11kV Panel Installation — Lekki Free Trade Zone
All Projects →

Ready to Start a Similar Project?

Our team is ready to assess your site, design a solution, and deliver on time.

Get in Touch
High Voltage Systems☀️Solar Energy🏗️EPC Contracting🔍Energy Audit🔧Infrastructure MaintenanceHV Switchgear☀️Solar Air Conditioning🏭Industrial Automation🔌ATS Panels🌍Nationwide Coverage📐Design & Engineering🔬Feasibility StudiesHigh Voltage Systems☀️Solar Energy🏗️EPC Contracting🔍Energy Audit🔧Infrastructure MaintenanceHV Switchgear☀️Solar Air Conditioning🏭Industrial Automation🔌ATS Panels🌍Nationwide Coverage📐Design & Engineering🔬Feasibility Studies